Comparing contractor bids: how to line them up before you look at the price

Three totals are not three comparisons. First make the bids describe the same job, then compare the numbers.

By FrameOak Editorial Team Updated 7 min read

Number of bids
At least three
Compare first
Scope and quantities
Check each
License and references
Engineer needed
For foundation problems
Illustration: three bid sheets side by side on a table with matching lines highlighted

In short

Compare bids only after they cover the same work, in the same units, with the same materials. California's contractor board advises getting at least three identical bids, with references, and checking each contractor's recent similar projects. A bid far lower than the rest often leaves something out, so ask what. This is general information, not legal advice.

Why three bids, and why "identical"

One bid tells you what one contractor would charge for what that contractor decided the job is. Three bids start to show you the range. They also show whether the contractors read the problem the same way.

California's Contractors State License Board checklist says to get at least three contractors to give you an estimate, along with references. Its pamphlet goes further and says to get at least three identical bids. The word "identical" is the point: give each contractor the same description of the job, and ask each to price that description. If you cannot write one, start with the scope of work, line by line.

What to line up

Lines to compare across bids, and what a mismatch can mean
LineWhat to compareA mismatch can mean
Quantity and unitSquares, linear feet, number of windows, piers, square feet of wallOne contractor measured or counted differently
MaterialsMaker, product line, grade, color, thicknessA cheaper product under the same generic name
Removal and prepLayers removed, surface repairs, hidden-damage rulePrep that one bid leaves to you
Permit and inspectionsWho applies, who pays, who attendsA fee or step left out of the total
Cleanup and haul-awayDebris, protection, daily cleanupDisposal priced separately or not at all
Schedule and paymentsStart window, duration, payment stepsA large deposit or payments ahead of the work

If a bid is a single lump sum, ask the contractor to itemize it in the same lines as the others. A contractor who will not say what the total covers is giving you less to compare, which is itself information.

Two more items to look for are allowances and alternates. An allowance is a placeholder amount for something not yet chosen, such as a window upgrade. If one bid carries a small allowance and another a larger one, their totals differ because of the placeholder, not the contractors. An alternate is an option priced separately, such as a different material. Ask every bidder to price the same alternates. Also note how long each price is held open, so you are not comparing a current price with an expired one.

A worked example of a unit trap

Suppose two bids for a roof have the same total. Bid A says the roof is 15 squares. Bid B says it is 18 squares. A roofing square is 100 square feet of roof surface, so that is 1,500 square feet against 1,800. Divide the same total by each: for Bid B, the price per square is 15 ÷ 18 = 0.833 of Bid A's, or about 83%.

That looks like Bid B is cheaper per square. It may only mean Bid B measured more roof, or counted a porch the other left out. Both cannot be right about the same roof. Ask each contractor to show their measurements. Do not compare per-unit prices until the quantities agree.

Check the contractor, not just the number

A bid comes from a company, so check the company. Ask for recent similar projects and references, and call a few. Look up the license where your state requires one, and ask for proof of insurance; see contractor licensing and insurance. Most state boards have a public lookup. Florida's licensing department, for example, says users can verify licenses by name or license number.

Be careful with pressure. A "today only" price, a demand for a large deposit or a refusal to put anything in writing is a reason to pause. Pay-as-you-go schedules are covered in lien waivers and the payment schedule.

When an engineer comes before the bids

For foundation movement or structural damage, bids from repair companies are only as good as the diagnosis behind them. A licensed structural engineer's report should say what is wrong and what repair is needed, and the repair bids should then price that report. The engineer should not be paid by the repair company. Without a report, each bidder may propose a different fix to a problem nobody has measured, and the totals will not compare.

For roofing, windows, siding and garage doors, the usual starting point is a clear scope and matching bids. A home inspector or a building department can answer questions about what the work should cover.

Questions to ask every bidder

  • What does your price include and exclude, in writing, line by line?
  • How did you measure, and can you show me the numbers?
  • Which products will you use, by maker and product line?
  • Who pulls the permit, and what inspections follow?
  • What happens if you find hidden damage, and who approves the extra cost before work continues?
  • May I see your license number, proof of insurance and two or three recent similar jobs?

If you would like bids from contractors who work in your area, the bid request form passes your details to home improvement contractors and installers. FrameOak is paid by those partners for each request, does not do the work, and does not say which contractor is better; see how we make money. Compare whatever bids you get the same way.

Sources

Facts on this page were last checked November 20, 2026. The California documents show no publication date. California and Florida are examples only; rules and lookups differ by state, so check your state attorney general and contractor licensing board. The roof example uses invented numbers. The guidance on itemizing, low bids and engineers is general. This is general information, not legal advice.

Questions homeowners ask

How many bids should I get?

California's contractor board advises at least three. For a major job, three gives you a range and a way to spot a bid that is out of line.

Should I take the lowest bid?

Not by default. First check that it covers the same scope, quantities and materials as the others, and that the contractor is licensed where required and insured. A low total can mean something was left out.

Can I use a contractor's bid to negotiate with another?

You can ask a contractor to explain a gap between bids. Do not show one contractor's pricing to another as a tactic if it makes the scopes harder to compare. A like-for-like scope is the better basis.

Do I need an engineer for every job?

No. For foundation movement and structural damage, get an independent structural engineer's report before repair bids. For other jobs, a clear scope is the starting point.

Get bids on this job

Describe the job in two short steps. FrameOak passes it to home improvement contractors and installers who work in your area; they set their own prices and terms and you decide whether to go ahead.

  1. 01 About the job.
  2. 02 Your contact details and consent.
  3. 03 A home improvement contractor or installer contacts you. Nothing is decided until you agree.

Step 1 of 2

About the job
Is it your house?

Leave it empty if you do not have one yet.

How soon?

FrameOak is not paid by you. The home improvement contractors and installers who contact you set their own prices and terms. How we make money.