Foundation · Roof · Water · Walls
Six jobs hold a house up. Price them in the right order.
FrameOak explains major home work in plain English, from drainage to the garage, and turns your ZIP code into a planning range for each job. It is a range to plan with, not a bid.
The order of work
- 01 Water and drainage Gutters, grading, drains
- 02 Foundation Piers, slabs, cracks
- 03 Roof Shingle, metal, tile
- 04 Windows and doors Windows and doors
- 05 Siding and insulation Cladding and wrap
- 06 Garage Build, door, slab
Water is first because it undoes everything else. The foundation comes before the roof and walls so that nothing is fitted to a house that is still moving. Describe the house's signs to the planner and it will order your own list.
Start with a guide
-
Water
Gutters and downspoutsSizing, where roof water should land, and what to put in writing before a gutter job.
-
Water
French drains and yard drainageWhat a French drain is, how slope and outlet decide whether it works, and what to ask before you sign.
-
Water
Foundation waterproofingInterior drains, exterior excavation and coatings compared, with a footage check for your bid.
-
Ground
Foundation repair methodsUnderpinning, grouting and crack injection explained, and why the engineer's report comes before bids.
-
Ground
Foundation cracks: what mattersWhich cracks are cosmetic, what widths the sources mention, and when to call a structural engineer.
-
Ground
Slab vs pier-and-beam foundationsHow the two foundation types differ in design, repair and moisture, and what to ask before you buy or sign.
Before you sign
A job goes wrong on paper before it goes wrong on site.
-
Scope of work, line by line
Quantities, materials, removal, cleanup, permits and exclusions: what a scope should say before you sign.
-
Comparing contractor bids
How to line up three or more bids so they cover the same job, and what a low or high total can mean.
-
Building permits for major work
When major work needs a permit, why rules differ by city and county, and who should pull it.
-
Contractor licensing and insurance
How to look up your state's license rule, what a lookup shows, and which insurance to ask for.
-
Contracts and change orders
What a home improvement contract should contain, how change orders work, and the federal three-day cancel rule.
-
Lien waivers and payment schedule
How liens arise, what conditional and unconditional releases do, and how to tie payments to finished work.
The estimator
Four tools, all in your browser.
-
Cost by ZIP
Pick the jobs and the quantities, add a ZIP code, and get a planning range for each job and for the total, adjusted for what construction trades are paid in your state.
-
Check a bid
Enter one line of a bid and where the house is. See where the price sits against the planning range and which questions to ask about it.
-
Rain runoff
Roof area and a rainfall in, gallons and peak flow out, split across your downspouts: how much water has to go somewhere that is not the foundation.
-
What to fix first
Answer a few plain questions about the house and get the six jobs in a sensible order, with the reason for each step.
Inspection log
-
· Proposed federal rule
HUD proposes to rescind its 2024 flood-elevation rule for HUD-assisted housingHUD rules reach only HUD-assisted or HUD-insured projects; a private foundation, garage or addition follows NFIP minimums and your local floodplain ordinance, so ask the local floodplain administrator whether base flood elevation affects your lot.
-
· State law
California adds contract and subcontractor disclosure rules for home improvement workWherever you live, ask in writing who the subcontractors are, what licenses they hold and how to cancel.
-
· Enforcement
FTC sends more than $2.9 million in refunds after home improvement financing caseA financing agreement signed at your door can put a lien on your home, so read it away from the sales table and do not sign anything you have not read.
Get bids on this job
Describe the job in two short steps. FrameOak passes it to home improvement contractors and installers who work in your area; they set their own prices and terms and you decide whether to go ahead.
- 01 About the job.
- 02 Your contact details and consent.
- 03 A home improvement contractor or installer contacts you. Nothing is decided until you agree.
FrameOak is not paid by you. The home improvement contractors and installers who contact you set their own prices and terms. How we make money.