- Allowance
- A placeholder amount in a bid for something not yet chosen, such as a door or a type of siding. If your choice costs more than the allowance, the difference is added to your price. More: Scope of work, line by line
C
- Certificate of insurance
- A document from a contractor's insurer or agent showing the coverage the contractor carries, such as liability and workers' compensation, and the policy dates. Ask for it before work starts and have it come from the insurer or agent. More: Contractor licensing and insurance
- Change order
- A written agreement, signed by you and the contractor, that changes the scope, price or schedule after the contract is signed. Without one, extra charges are an argument waiting to happen. More: Contracts and change orders
- Continuous insulation
- Insulation that runs unbroken over the wall framing, usually as rigid board outside the sheathing, so the studs do not leave gaps in it. It thickens the wall, which affects how windows, flashing and siding are attached. More: Exterior insulation and house wrap
- Control joint
- A planned groove or cut in a concrete slab that makes it crack along a straight line instead of wherever it likes. Cracks along joints are expected; a crack that shifts to one side or keeps widening is worth showing to an engineer. More: Garage slab and foundation repair
- Cooling-off rule
- An FTC rule that gives you three business days to cancel certain sales made at your home or away from the seller's permanent place of business. It has exceptions, including a true emergency where you sign a handwritten waiver and a visit you requested to repair your personal property, and state law may add rights. More: Contractor scams after storms
- Crawl space
- The shallow, unfinished space under a raised floor. Standing water, damp soil and poor ventilation there can affect the floor framing, which is why drainage and moisture control come up in bids for this space. More: Foundation waterproofing
D
- Deposit
- Money paid before work starts. Some states limit how much a contractor may ask for, so check your state, and tie later payments to finished stages of the work. More: Lien waivers and payment schedule
- Differential settlement
- One part of a foundation sinking or rising more than another. It is this uneven movement, not even settling across the whole house, that tends to crack walls and make doors stick. More: Foundation cracks: what matters
- Drip edge
- Metal flashing along the roof edges that guides water into the gutter and away from the fascia and roof deck. Where it sits relative to the underlayment is set by the building code and the roofing manufacturer's instructions. More: Roof replacement step by step
E
- Expansive clay
- Soil that swells when it gets wet and shrinks when it dries. Seasonal moisture changes around a house can make a foundation rise and drop unevenly. More: Foundation cracks: what matters
F
- Final inspection
- The building inspector's last visit after the work is done, to confirm it meets the code and the permit can be closed. Ask the contractor for the signed inspection record. More: Building permits for major work
- Flashing
- Thin metal or other waterproof material that directs water out and away at joints and openings, such as roof valleys, chimneys, windows and door heads. Leaks often start at flashing, so ask what will be replaced and what will be reused. More: Window installation and flashing
- Footing
- The wider concrete base under a foundation wall or column that spreads the load over the soil. A footing sitting on soil that swells, shrinks or washes out can move with it. More: Foundation repair methods
- French drain
- A trench lined with fabric and filled with gravel, usually with a perforated pipe, that collects shallow groundwater and surface runoff and carries it to a place where it can drain away. Roof water is better handled by gutters and downspouts. More: French drains and yard drainage
G
- Grade
- The slope of the ground around the house. Ground that slopes away from the foundation carries rain away from it; ground that slopes toward the house sends water to it. More: French drains and yard drainage
H
- Header
- A horizontal beam over a door, window or garage door opening that carries the load above across the gap. Its size depends on the span and the load, and the plans or the building code set it. More: Building a garage
- House wrap
- A water-resistive barrier over the wall sheathing and under the siding. It sheds water that gets behind the siding and has to be lapped and flashed correctly around windows and doors. More: Exterior insulation and house wrap
- Hydrostatic pressure
- The force of water in saturated soil pressing on a basement wall or slab. It can push water through cracks, joints and porous concrete, so waterproofing bids should address drainage as well as sealing. More: Foundation waterproofing
L
- Lien waiver
- A signed document in which a contractor, subcontractor or supplier gives up the right to file a lien for the amount paid. Ask for one with each payment; forms and rules vary by state. More: Lien waivers and payment schedule
- Low-E coating
- A thin, nearly invisible metal coating on window glass that reduces heat flow. Different coatings favor keeping heat in or keeping solar heat out, so the right choice depends on your climate. More: Replacement windows and ratings
M
- Mechanic's lien
- A legal claim against your property filed by an unpaid contractor, subcontractor or supplier. In many states an unpaid subcontractor can file even if you paid your contractor in full, which is why lien waivers matter. More: Lien waivers and payment schedule
N
- NFRC
- The National Fenestration Rating Council, a nonprofit that runs a rating and labeling program for windows, doors and skylights. The NFRC label lists U-factor, SHGC and other ratings measured with a common method. More: Replacement windows and ratings
P
- Permit
- The building department's written approval to do specified work, normally followed by inspections. In most places roof replacement, structural repair and a new garage need one. Confirm with your local building department. More: Building permits for major work
- Pier
- A vertical support that carries a load down to firmer soil or rock. In foundation repair, steel or concrete piers are driven or drilled below the zone where the soil moves, and the foundation is supported on them. In a pier-and-beam house the piers are the short columns under the beams. Bids usually count piers, so ask how many and how deep. More: Foundation repair methods
- Pier and beam
- A foundation that holds the floor frame on beams resting on piers, which leaves a crawl space under the house. Plumbing and ducts are reachable from below, and a floor can be leveled by adjusting or replacing supports. More: Slab vs pier-and-beam foundations
- Punch list
- The list of small items left to finish or fix near the end of a job, such as touch-up, missing trim or a door that rubs. Walk the job with the contractor and write the list down before the final payment. More: Contracts and change orders
R
- R-value
- A measure of how well insulation resists heat flow: higher means more resistance. It applies to the material as installed, so gaps and compression lower real performance. Do not compare it with a window's U-factor, where lower is better. More: Exterior insulation and house wrap
- Retainage
- A portion of the price held back until the job is finished and accepted. It gives you leverage to get the last items done, and the amount and the release terms should be in the contract. More: Lien waivers and payment schedule
- Roof decking
- The boards or panels, usually plywood or OSB, fastened to the rafters that the roofing sits on. Ask how damaged decking found after the old roofing comes off will be priced before you sign. More: Roof replacement step by step
- Rough opening
- The framed opening in a wall that a window or door is set into. If the opening is out of square or the framing around it is damaged, it may need repair, and the scope of work should say who does that. More: Window installation and flashing
S
- Scope of work
- The written list of exactly what the contractor will do: materials, measurements, what is removed, what is left out, cleanup and the permit. Bids can be compared only if each one is built on the same scope. More: Scope of work, line by line
- SHGC
- Solar heat gain coefficient: the share of the sun's heat that gets through a window, on a scale from 0 to 1. A lower number blocks more solar heat, which usually matters more in hot climates. More: Replacement windows and ratings
- Slab jacking
- Raising a sunken concrete slab by pumping grout or foam under it through small drilled holes, also called mudjacking or foam jacking. It lifts the slab but does not by itself explain why the soil moved, so ask what caused the settling and how that will be addressed. More: Garage slab and foundation repair
- Slab-on-grade
- A foundation made of a concrete slab poured at ground level, usually thickened at the edges and reinforced with steel bars or cables. There is no crawl space under the floor. More: Slab vs pier-and-beam foundations
- Square (roofing)
- A roofing unit of measure: 100 square feet of roof surface. Squares are measured on the roof itself, not the footprint of the house, so slope and a complicated roof shape raise the count. More: Roof replacement step by step
- Structural engineer
- A licensed engineer who evaluates a foundation or frame and reports on the cause, the severity and the repair method. For a foundation, get the report before repair bids, from an engineer who is not paid by a repair company. More: Foundation repair methods
- Sump pump
- A pump set in a pit that lifts collected water out of a basement, crawl space or drain system and sends it away through a discharge line. It needs power and regular testing, so ask about backup power and where the discharge line ends. More: Foundation waterproofing
T
- Tear-off
- Removing the old roofing down to the deck before new materials go on. Ask whether the bid assumes a full tear-off and how many layers are there now, because local rules limit when a new roof can go over an old one. More: Roof replacement step by step
- Torsion spring
- The large spring above a garage door that balances its weight so it can be lifted. It is under heavy tension and is replaced by trained technicians, not as a do-it-yourself job. More: Garage door replacement
U
- U-factor
- A rating of how fast heat passes through a whole window, door or skylight, frame included. Lower numbers mean less heat loss, so compare U-factors only from NFRC labels. More: Replacement windows and ratings
- Underlayment
- The water-resistant layer installed over the roof deck, under the shingles or other roofing. It is a backup if water gets past the top layer, and the bid should name the product. More: Roof replacement step by step
- Unit price
- A price per unit of work, such as per pier, per square, per linear foot or per window. It sets the cost of extra quantities in advance, so ask for unit prices to be written into the contract. More: Comparing contractor bids
W
- Workers' compensation
- Insurance that pays medical costs and lost wages for workers hurt on the job. Rules about who must carry it vary by state, so ask the contractor for proof of coverage and check your state's rules. More: Contractor licensing and insurance
- Workmanship warranty