Contracts and change orders: what to read, what to write down, what you can cancel

The contract is the only version of the deal that counts. Anything you want later, from a different shingle to an extra day of cleanup, needs to be in it.

By FrameOak Editorial Team Updated 8 min read

Put in writing
Everything agreed
Changes need
A signed change order
Federal cancel right
3 days, some sales
Rules vary by
State
Illustration: a signed contract with a stapled change order form and a pen on a kitchen table

In short

A contract for major work should hold everything you and the contractor agreed to, and every later change should be a written change order signed by both of you. California's contractor board says a signed change order becomes part of the written contract. The FTC's Cooling-Off Rule gives a three-business-day right to cancel for certain sales made at your home or away from the seller's place of business. State rules differ. This is general information, not legal advice; a lawyer in your state can tell you how it applies.

What the contract is for

A contract turns a bid into an agreement. It says what will be done, for what price, on what schedule and under what conditions. If you and the contractor disagree later, the written document is what people read first, and spoken promises are hard to prove.

California's Contractors State License Board says a contract should contain everything agreed upon by you and your contractor, including the price and when payments will be made, and that it must identify the contractor with address and license number. Its checklist says to get a detailed written contract and not to sign until you understand all the terms. Do not sign with blanks in it.

What a written contract should contain

Who and what

The legal name, address and license number of the contractor, and your name and the address of the job. Attach the scope; see scope of work, line by line.

Price and payments

The total, how it is paid and when, and what each payment is tied to. See lien waivers and the payment schedule.

Time

A start window, an expected finish and a rule for delays from weather, supply or inspections.

Permits and cleanup

Who pulls permits, who pays fees, and what cleanup and haul-away are included. See building permits for major work.

Warranty

What is promised, by whom, for how long, and what voids it. Get the manufacturer's terms and the contractor's workmanship terms in writing.

Required notices

Some states require specific wording. Florida, for instance, requires a lien-law notice in direct contracts for residential improvements above $2,500. Your state may require others.

California also states a written-contract threshold: home improvement projects over $500 in combined labor and materials. Florida's lien-law notice must be in at least 12-point, capitalized, boldfaced type and signed and dated by the owner. These are two examples of state rules, not a rule for every state. Look up yours at your attorney general's consumer pages or your contractor licensing board.

Change orders

Almost every major job changes. You pick a different color, the contractor finds rot, or an inspector asks for something. A change order is the written record of that change. California's contractor board says changes should be noted in writing, including any price changes, and that once a change order is signed it becomes part of the written contract. Its checklist says to make sure all changes are in writing and signed by both parties.

A good change order names the change, the price difference, whether it adds or removes days, and the date. It is signed before the extra work starts. A change order that says "extra, to be billed later" is not one. If the contractor says there is no time for paperwork, ask for a one-line signed note on the spot and a photo of it.

The three-day right to cancel

The FTC's Cooling-Off Rule, 16 CFR Part 429, applies to door-to-door sales, which it defines as a sale of consumer goods or services for personal, family or household purposes in which the seller or its representative personally solicits the sale and your agreement is made at a place other than the seller's place of business. The price must be $25 or more if the sale is made at your residence, or $130 or more at other locations away from the seller's place of business. The definition lists exclusions, so check it.

Where the rule applies, the seller must give you a completed copy of the contract with a cancellation statement, a completed cancellation notice with the seller's name and address, the date and the cancellation deadline, and tell you orally about the right to cancel. You may cancel up to midnight of the third business day. A business day is any calendar day except Sunday or a federal holiday. The seller must honor a valid cancellation within 10 business days.

Take a contract signed at your kitchen table on a Friday. Saturday counts as a business day, Sunday does not, so the third business day is Tuesday and the deadline would be midnight Tuesday, assuming no federal holiday falls in between. The notice must show the exact date, so use that date and not this count. Whether a particular sale is covered is a legal question for a lawyer or the FTC.

States add their own rules. California's contractor board says you may cancel within three days of signing, that the cancellation must be in writing and mailed before midnight of the third day, and that seniors have five days.

What to put in writing

  • Is the scope attached to the contract, with quantities and products named?
  • Does the contract show the contractor's legal name, address and license number?
  • How are the price, payments, start date and finish date written?
  • What happens if I want to change something, and what is the written change-order process?
  • Who pulls the permit, and what does the contract say about inspections?
  • Do I have a signed copy, and did I get the cancellation notice if the sale was at my home?

Read the contract at your own pace, take it home and ask a lawyer in your state if the stakes are high. For the money side, see check a bid, and use the cost-by-ZIP estimator, which is free to use, for planning ranges.

Sources

Facts on this page were last checked November 20, 2026. The 16 CFR pages were read on the Cornell Legal Information Institute site, which publishes the Code of Federal Regulations; the California pages show no publication date. The cancellation-deadline count is an illustration, and the notice's printed date controls. California and Florida are examples only; other states differ. This is general information, not legal advice; a lawyer in your state can tell you how it applies.

Questions homeowners ask

Does every job need a written contract?

Many states require one above a set size. California's contractor board states a threshold of $500 in combined labor and materials, for example. For major work, get one whatever the rule says.

Can the contractor start before a change order is signed?

You can agree to that, but you lose the record. Ask for the signed change order first, including any change in price and schedule.

Does the three-day right to cancel apply to my contract?

Possibly, if the sale was made at your home or elsewhere away from the seller's place of business and meets the FTC rule's definition and price thresholds. The seller must give you a notice that shows the deadline. Ask a lawyer or the FTC if you are unsure.

Should I sign on a tablet?

California's contractor checklist advises asking for a paper copy if you sign on an electronic device. In any case, keep a complete signed copy of the contract and every change order.

Get bids on this job

Describe the job in two short steps. FrameOak passes it to home improvement contractors and installers who work in your area; they set their own prices and terms and you decide whether to go ahead.

  1. 01 About the job.
  2. 02 Your contact details and consent.
  3. 03 A home improvement contractor or installer contacts you. Nothing is decided until you agree.

Step 1 of 2

About the job
Is it your house?

Leave it empty if you do not have one yet.

How soon?

FrameOak is not paid by you. The home improvement contractors and installers who contact you set their own prices and terms. How we make money.