Roof replacement step by step: what happens, in what order, and what to put in writing

A roof replacement is more than new shingles. The deck, the water barriers, the flashing and the vents decide how long the roof lasts, and each one belongs in the written scope.

By FrameOak Editorial Team Updated 7 min read

What it fixes
Worn or leaking covering
What drives the price
Area, layers, deck repairs
Permit
Needed in most places
Who to hire
A roofing contractor
Illustration: a roof cut away in layers showing the deck, underlayment, flashing and shingles

In short

A roof replacement removes the old covering, checks and repairs the deck, installs the water barriers and flashing, and then lays the new roof covering and vents. Roofs are measured in squares of 100 square feet. The Asphalt Roofing Manufacturers Association (ARMA) says a residential roof more than 20 years old is a prime candidate for reroofing, and that new shingles cannot go over a warped, rotted or unsound deck. FrameOak gives no prices here: planning ranges for your ZIP code are in the cost estimator, and a bid is the only real number.

What a full replacement includes

ARMA lists the working parts of an asphalt shingle roof. Underlayment sits between the wood deck and the shingles and acts as a secondary water barrier. Ice and water barriers protect vulnerable areas such as valleys and areas around chimneys. Starter strips give the first row of sealant that helps keep shingles from blowing off. Ridge products finish the top, and a balanced ventilation system lets heat and moisture escape from the attic. A bid that names only "shingles" leaves most of these parts undefined.

Some shingles can be laid over an existing roof, which is called a recover. ARMA says shingles can often be applied over existing roofs without tearing off the old roof, but not over hard or brittle materials, an uneven nailing surface, or a deck that is warped, rotted or unsound. It also says some local ordinances forbid reroofing over two or more layers of shingles, and that you should confirm the deck can carry the added weight. Ask every bidder whether they plan a tear-off or a recover, and why.

The usual sequence of work

  1. Paperwork and permit. The contractor signs a written scope, orders materials and, in most places, pulls the permit. See building permits for major work.
  2. Tear-off. The crew removes the old covering down to the deck. Ask how the crew will protect plants, siding, windows and the attic floor, and how nails will be cleaned from the yard and drive.
  3. Deck check. Damaged or rotted boards and panels are replaced before anything new goes on. Since you cannot see the deck once it is covered, agree beforehand how a price per sheet or per board is handled. That is a change-order question; see contracts and change orders.
  4. Water barriers and edge metal. Underlayment goes down, with ice and water barrier at valleys and other vulnerable spots. Drip edge, a metal strip at the roof edge, is part of the edge detail.
  5. Flashing. HUD's rehab guide calls flashing the last line of defense against water. It is the metal or membrane at walls, chimneys, valleys and pipe penetrations, and it is where many leaks start.
  6. Roof covering. Starter strips and shingles, or another covering, are installed following the manufacturer's instructions for nailing and exposure.
  7. Vents, ridge and cleanup. Ridge and vent products go on, the crew sweeps the property, and the contractor requests the final inspection where one is required.

The HUD Rehab Guide, Volume 3, is dated March 1999, so use it for how flashing and underlayment work, not for current product names. It says that for ice damming, eaves get two layers of No. 15 felt or one layer of No. 30 extending 36 inches inside the exterior wall. Whether your area needs that, or an ice barrier membrane, is a local code question.

How roofs are measured and priced

Roofers price by the roofing square, which is 100 square feet of roof surface. Take a simple gable roof with two equal planes. If each plane runs 40 feet along the eave and 15 feet up the slope, each is 40 × 15 = 600 square feet. Two planes make 1,200 square feet, which is 12 squares. Real roofs have hips, valleys, dormers and waste, and the slope length is longer than the horizontal run, so a bid's measurement can differ from your estimate. Ask for the square count in writing and check it against your own figure.

Price per square moves with the covering, the number of layers to remove, how steep and complex the roof is, deck repairs, flashing work, ventilation changes, access and local labor rates. FrameOak does not list prices. Run your numbers in the cost estimator for a planning range, then use check a bid to see whether a bid names each part.

What the permit and inspection normally cover

Most places require a building permit for a roof replacement, and some also require an inspection when the work is done. Rules differ by city and county, so confirm with your local building department what is required and which stages are inspected. Ask who pulls the permit, and keep a copy. Whether the contractor needs a license depends on your state; licensing explains how to look it up.

If you live in a hurricane or high-hail area, ask the building department whether the code sets wind or impact requirements. The Insurance Institute for Business and Home Safety (IBHS) runs a voluntary FORTIFIED Roof program. Its March 2019 re-roof checklist, for example, calls for removing all existing roofing and replacing compromised wood, re-nailing the deck with ring-shank nails at 6 inches on center, and sealing the deck. That is a program standard, not a code rule, and your insurer decides whether it affects your policy.

Signs of a bad job

  • The bid will not say whether the deck gets inspected or what happens if boards are rotted.
  • New shingles are planned over a soft, uneven or rotted deck, which ARMA says should be repaired or replaced first.
  • No permit, when your building department requires one, or a request that you pull it yourself.
  • Flashing is called reusable without anyone showing you its condition.
  • A demand for full payment before work starts, or pressure to sign the same day.
  • Exposed nail heads, shingles that are crooked or not sealed, or debris left in gutters at the end.

What to put in writing before you sign

  • Square count, the covering by brand and product line, and the underlayment and ice barrier to be used.
  • Tear-off or recover, and the number of layers coming off.
  • A price per sheet or board for deck repairs, and how you will see the damage before it is covered.
  • Flashing, drip edge, vents and ridge products, listed by item.
  • Who pulls the permit, who schedules inspections, and what happens if one fails.
  • The manufacturer warranty, the contractor's workmanship warranty, and who honors each.
  • A payment schedule tied to stages, and a lien waiver at each payment.

Paperwork is covered in lien waivers and payment schedule. Compare scope line by line before you compare totals. When you are ready, you can request bids from contractors who work in your area.

When to get an independent opinion

If a bid calls for far more deck replacement than the others, or if the roof has sagged, a structural engineer or an independent roof inspector who does not sell roofs can look at it. Choose one who is not paid by the roofing company. The choice between repair and replacement is covered in roof repair or replace.

Sources

Facts on this page were last checked November 20, 2026. The HUD guide dates from 1999 and the IBHS checklist from March 2019; both describe practice, not current code. The ICC residential code chapter on roof assemblies could not be opened, so no code section is quoted. The sequence of work is general, and the roof example is an invented illustration. FrameOak does not install roofs.

Questions homeowners ask

How do I know how many squares my roof has?

A square is 100 square feet of roof surface. Multiply each plane's length by its slope length, add the planes, and divide by 100. Ask each bidder for their number in writing, since hips, valleys and slope change the total.

Can new shingles go over the old ones?

ARMA says shingles can often go over an existing roof, but not over brittle material, an uneven surface or an unsound deck, and some local ordinances forbid a layer over two or more existing layers. Ask the contractor why they chose a recover or a tear-off.

Do I need a permit to replace a roof?

In most places, yes. Confirm with your local building department. Rules and inspection stages differ by city and county.

Is a roof replacement a job I can do myself?

FrameOak gives no instructions for roof-height work. It is dangerous, and a roofing contractor with fall protection does it.

Get bids on this job

Describe the job in two short steps. FrameOak passes it to home improvement contractors and installers who work in your area; they set their own prices and terms and you decide whether to go ahead.

  1. 01 About the job.
  2. 02 Your contact details and consent.
  3. 03 A home improvement contractor or installer contacts you. Nothing is decided until you agree.

Step 1 of 2

About the job
Is it your house?

Leave it empty if you do not have one yet.

How soon?

FrameOak is not paid by you. The home improvement contractors and installers who contact you set their own prices and terms. How we make money.